Guides for the people moving the file.
What the report says, who can sign it, and what to send so the scope is right the first time.
Reports for the loan file
Ordering checklist for loan processors
What a processor should collect and send before ordering a moved-home structural report.
Reading the condition on a moved manufactured home
How to read a moved-home engineering condition and pin down the scope before you order.
Structural integrity report vs foundation certification
How to tell whether your condition asks for a structural report, a foundation certification, or both.
What a structural integrity report contains
What is inside a Professional Engineer's report on a moved home, and how to read it against your file.
When the report lists corrections: your next steps
What a loan officer or processor does when a moved-home report lists findings that need work.
Who can sign a structural integrity report?
A Professional Engineer licensed where the home sits signs the report. What to check before it reaches review.
Rather have an engineer look at it?
Send the address and a few details. A licensed engineer replies within one business day.