For loan officers and processors
The moved-home condition, cleared.
Underwriting wants an engineer to confirm a relocated manufactured home is structurally sound. Send the condition as written. We inspect the home and seal a report built for the file.
- Licensed Professional Engineer in seven states
- Scope confirmed against the condition before the visit
- A signed PDF for the mortgage file
Rather talk it through? Call (314) 834-5853.
- 7 states
- One engineer of record, a licensed Professional Engineer in each
- 1 business day
- For an engineer to read the condition and call you back
- Scope and fee first
- Confirmed against the condition before the visit is booked
- Signed PDF
- For the mortgage file, sent to you when the borrower authorizes it
Where to start
What does the condition ask for?
Conditions on moved homes come in three shapes. Yours is probably one of these.
A structural integrity inspection
The home was relocated and the file needs an engineer's opinion after the move.
Structural integrity inspection
A foundation certification
The file needs the foundation at the current site certified.
Foundation certification
Corrections were listed
A first report found items to fix, and the file needs them confirmed.
Re-inspection after correctionsWhat is in it
A report an underwriter can use
The report answers the question the condition asks, in the order a reviewer reads it. What a structural integrity report contains.
- The property. Address, home identification, and the date of the inspection.
- What was inspected. Frame and chassis, section connections, supports, and anchors at the current site.
- What was observed. Conditions as found, with photographs.
- The opinion. The engineer's structural opinion within the agreed scope, signed.
- Corrections, if any. Listed plainly, so the next step is clear.
How it works
From condition to signed PDF
The scope and the fee are confirmed before the visit is booked. More on how it works.
- 1
Send the condition
As underwriting wrote it, with the address, loan type, and closing date. We reply within one business day.
- 2
The engineer inspects
At the home's current site, with access arranged through the borrower.
- 3
The report arrives
A signed PDF, delivered to the borrower and to you when they authorize it.
Before you call
Guides
Short reads for the people moving the file.
What a structural integrity report contains
What is inside a Professional Engineer's report on a moved home, and how to read it against your file.
Structural integrity report vs foundation certification
How to tell whether your condition asks for a structural report, a foundation certification, or both.
Reading the condition on a moved manufactured home
How to read a moved-home engineering condition and pin down the scope before you order.
Ordering checklist for loan processors
What a processor should collect and send before ordering a moved-home structural report.
- Missouri
- Arkansas
- Illinois
- Kansas
- Iowa
- Nebraska
- Indiana
A file waiting on an engineer?
Send the address and a few details. A licensed engineer replies within one business day.