SIRReport

Re-inspection after corrections.

A return visit to confirm the items a first report listed have been corrected.

Request this service
A contractor tightening a new anchor strap under a manufactured home

What happens when a report lists corrections?

The borrower has a contractor make them, and the engineer returns to look at the corrected items. The result is documented in writing so the file shows the items were addressed.

Issued in: Missouri, Arkansas, Illinois, Kansas, Iowa, Nebraska, Indiana.

When you need it

  • A structural integrity report came back with corrections
  • A foundation did not qualify for certification the first time
  • The contractor has finished and the file needs it confirmed
  • A closing date depends on the follow-up

What the engineer looks at

  • Each item the first report listed, one by one
  • Whether the correction matches what the report called for
  • Anything the repair work disturbed nearby

What you get

  • A written follow-up to the first report
  • Photographs of the corrected items
  • A plain statement of anything still open
  • A PDF for the mortgage file

Common questions

Does the same engineer come back?

Yes. The engineer who wrote the first report re-inspects the items it listed.

Can a report from another firm be followed up?

Send it. The engineer will say whether a follow-up is workable or whether a new inspection is the cleaner path.

Who arranges the repairs?

The borrower hires the contractor. The engineer does not sell or perform repairs, which is what keeps the opinion independent.